Nuclear Reactor Dome Hoisting

This system is used for lifting and positioning a nuclear reactor dome. Multiple heavy-lift cranes, including crawler cranes, are employed to maneuver the prefabricated structure into place.

Dome hoisting - Image 1

Technical Specifications

Overview

Nuclear Reactor Dome Hoisting Operations

This specialized engineering service focuses on the critical dome hoisting phase of nuclear reactor building construction. The process involves the precise lifting and positioning of large, prefabricated dome structures onto cylindrical reactor buildings. Utilizing heavy-lift crawler cranes and advanced positioning techniques, this operation ensures the structural integrity of the containment vessel.

Operational Capabilities

Hoisting Method
Multi-crane coordinated heavy lifting
Primary Equipment
Heavy-lift Crawler CranesConstruction CranesSupport StructuresPrecision Rigging

Project Scope

Construction Phase

Containment InstallationStructural Completion

Application Environment
Nuclear Power Plant Construction Sites

Technical Features

Structure Type

  • Prefabricated Dome Structure
  • Cylindrical Reactor Building
  • Reinforced Construction Layers

Operational Focus

100 %
Precision Alignment