Puffed Snack Food Production Line 120-500 kg/h
This puffed snack food machine line can produce between 120-500kg/h of product. It uses corn flour or rice flour as raw materials which are shaped by dies in a twin screw extruder.





Technical Specifications
Overview
Versatile Puffed Snack Production
This industrial-grade production line is designed to manufacture a wide variety of extruded snacks, including cheese curls, corn puffs, rings, balls, and sticks. Utilizing advanced twin-screw extrusion technology, the system processes raw materials like corn flour, rice flour, and wheat flour into consistent, high-quality shapes. The modular design integrates mixing, extrusion, drying, and seasoning systems to provide a complete end-to-end manufacturing solution for B2B food producers.

Technical Performance
Production Capacity
Model Comparison Table
| Model | Capacity (kg/h) | Dimension (L*W*H) |
|---|---|---|
| ZH65 | 120-150 | 26*3*3m |
| ZH70 | 200-250 | 30*3*3m |
| ZH85 | 400-500 | 40*3*3m |
Material & Build
Screw Specifications
- Material: 38CrMoAl
- Nitriding treatment for high strength
- Wear-resistant for long service life
- Available in integral, semi-assembled, or fully assembled configurations
- Construction Material
- Food-grade stainless steel
Components & Control
Electrical Standards
- Key Components
- Siemens Main MotorABB RelayDelta/Siemens InverterOmron/Schneider Electrical PartsPLC Touch Screen Control
Raw Materials & Output
Customization Capabilities
- OEM/ODM options available
- Adjustable size and shape via exchangeable dies
- Customizable colors and energy content
- Variable filling options for local tastes
- Compatible Raw Materials
- Corn FlourRice FlourWheat FlourStarch

Service & Support
Included Services
- On-site installation and trial running
- Worker training at customer site
- Discounted spare and wearing parts
- Whole-life technical service
- Basic food formulas provided
- Warranty
- 2 years
Logistics
Packaging & Delivery
- Protective film wrapping
- Secure wooden case packing
- Professional loading via forklift
- Lead time: 20-40 working days depending on customization




