Technical Specifications
Project Overview
Engineering Excellence in Hydropower
This hydroelectric power plant project represents a significant achievement in mechanical and electrical engineering design. With a total installed capacity of 1475MW, the facility harnesses the flow of the Indus River to provide critical power infrastructure. The project was successfully executed through a competitive international bidding process, demonstrating high-level engineering capabilities.
Total Installed Capacity
Project Timeline
Construction Milestones
| Milestone | Date |
|---|---|
| Initial Power Generation (Units 1 & 2) | August 2003 |
| Full Plant Completion (5 Units) | April 2004 |
Technical Details
- Location Context
- Indus River main current
- Total Generating Units
- 5 units