Technical Specifications
Project Overview
Hydropower Generation System
This hydropower generation system features a robust concrete gravity dam design with a maximum height of 61.3 meters. With an installed capacity of 100MW, the facility is engineered for high-efficiency energy production, boasting an annual generating capacity of 406 million kWh. The project represents a significant infrastructure investment, demonstrating large-scale engineering capabilities.
Technical Specifications
Installed Capacity
- Annual Generating Capacity
- 406000000 kWh
- Maximum Dam Height
- 61.3 m
- Dam Type
- Concrete Gravity Dam
Project Timeline
Project Milestones
| Milestone | Date |
|---|---|
| Construction Start | May 2005 |
| Full Operational Status | July 2009 |
Investment
- Total Static Investment
- 7 billion yuan