Hydropower Station with 3x2500 kW Turbine Generators
This hydropower station has a total installed capacity of 3x2500 kW. The dam is 50m high and was completed in December 1997.



Technical Specifications
Project Overview
Songpu Hydropower Station Overview
This significant hydroelectric power project was developed to provide sustainable energy infrastructure. Featuring an impressive dam height of 50 meters, the station demonstrates robust engineering standards and international development cooperation. The site successfully transitioned from initial survey to operational status, showcasing its reliability for large-scale power generation.
Technical Specifications
Total Installed Capacity
- Turbine Configuration
- 3 x 2500 kW Turbine Generators
- Dam Height
- 50 m
Project Timeline
Project Timeline
| Milestone | Date |
|---|---|
| Construction Start | May 1997 |
| Damming | December 1997 |
| First Unit Generation | April 1999 |