Hydroelectric Power Station Project
This project supports hydroelectric power station repair. It also includes a power plant to Phnom Penh transmission line and a transformer.



Technical Specifications
Project Overview
Cambodian Hydroelectric Infrastructure Development
This hydroelectric power station project encompasses comprehensive survey design, station repair, and critical infrastructure upgrades. The scope includes the construction of a power plant, the development of a transmission line to Phnom Penh, and the expansion of transformer substation capabilities. Completed within a rapid 13-month timeline, this facility provides reliable energy generation and distribution support.
Technical Specifications
Installed Capacity
- Generator Configuration
- 2 x 6MW units
- Reservoir Total Storage
- 9190000 m3
- Annual Power Rate
- 62.5 GW.H
Project Timeline
Development Schedule
| Milestone | Date |
|---|---|
| Project Start | April 2001 |
| Completion and Commercial Operation | May 2002 |
Infrastructure
Scope of Work
- Survey design
- Hydroelectric power station repair
- Power plant construction
- Phnom Penh transmission line development
- Transformer substation extension