Railway and Port Construction Project
The Cambodia Preah Vihear Rowan to Kiri Sakor Railway and Mahlo Port Project involves the construction of a railway line connecting Preah Vihear province to Kiri Sakor district, culminating in the development of the Mahlo Port. This foreign engineering contracting project aims to enhance transportation infrastructure, facilitating trade and economic growth in the region.



Technical Specifications
Project Overview
Integrated Infrastructure Development
This comprehensive infrastructure project encompasses the construction of the Preah Vihear Rowan to Kiri Sakor Railway and the development of the Mahlo Port facility. Spanning a total length of 404.481 km, the railway connects critical mining and transport hubs, passing through Kampong Thom, Kampong Chhnang, and Kampong Speu provinces. The project integrates advanced railway engineering with port infrastructure to facilitate efficient cargo handling and regional logistics.
Technical Specifications
Key Infrastructure Components
- Railway track laying
- Signaling systems
- Rolling stock integration
- Harbor construction
- Cargo handling facilities
- Mahlo Port Bridge
- Total Railway Length
- 404.481 km
- Provinces Served
- Preah VihearKampong ThomKampong ChhnangKampong SpeuKoh Kong



