Railway Turnout System
Railway turnout system designed for use in coal railway operations. The system includes rails, ballast, switch mechanism, and a control box.



Technical Specifications
Project Overview
Project Overview
This railway turnout system is a critical component of the Central Kalimantan coal railway infrastructure project. The route spans 282 km, connecting Lakutan in the north to the coal terminal at port Roanggailang in the south. The system is engineered to support heavy-duty coal transport operations.
Technical Specifications
- Total Route Length
- 282 km
- Primary Application
- Coal RailwayPort InfrastructureHeavy-duty Transport
System Components
Included Components
- Switch mechanism
- Switch machine
- Control box
- Railway infrastructure
- Ballast



