MV/LV Power Distribution System Rehabilitation
This project involves the rehabilitation of a medium/low voltage power distribution system. It provides a stable electricity supply, improving power utilization for local residents and businesses.




Technical Specifications
Project Overview
MV/LV Power Distribution Rehabilitation
This EPC contracting project focuses on the comprehensive rehabilitation of medium-voltage (MV) and low-voltage (LV) power distribution systems. Located in the Malanje province of Angola, the project is engineered to provide a stable and reliable electricity supply. It significantly enhances the infrastructure capacity for both Malanje and Cacuso City, directly improving daily living and commercial power utilization for local residents.
- Project Location
- Malanje Province, Angola
- Service Type
- EPC ContractingInfrastructure RehabilitationPower Distribution
Technical Scope
System Scope
- Medium-Voltage (MV) Distribution
- Low-Voltage (LV) Distribution
- Power Line (P.L.) Rehabilitation
- Substation Construction
- Protection and Connection Hardware



