Modular Process Construction Tower for Refineries

This large-scale modular tower is designed for chemical engineering applications in petroleum refineries. The petrochemical processing unit is engineered for the efficient separation and processing of hydrocarbons.

MPC Tower - Image 1

Technical Specifications

Overview

Modular Process Construction Tower

This high-capacity modular process construction tower is engineered specifically for complex petroleum refinery and chemical engineering applications. Designed for the efficient separation and processing of hydrocarbons, this unit facilitates enhanced refinery operations and increased production throughput. Its modular construction architecture is optimized for streamlined transportation and accelerated on-site installation, significantly reducing project timelines and capital expenditure.

Technical Specifications

Material Grade
SA 240 GR 316L
Design Pressure
0.5 Mpa
Design Temperature
300 ℃
Total Weight
67.25 T

Dimensions

Tower Dimensions

3,400 mm
Diameter
34,770 mm
Height
15 mm
Wall Thickness

Vous souhaitez sourcer ce produit ?

Soumettez une demande pour être mis en relation avec des fabricants vérifiés qui produisent ce produit.

Your information is protected. Privacy policy · Terms of service