Hydroelectric Dam Project

This is a clay core rock fill dam with a maximum height of 101 m and a crest length of 1,090 m. It required the excavation and earthmoving of 18 million m3 of material.

Taleghan Hydroelectric Project (EPC) Iran - Image 1

Technical Specifications

Project Overview

Hydroelectric Dam Infrastructure

This clay core rock fill dam is designed for large-scale hydroelectric power generation and water management. Spanning over one kilometer in crest length, the infrastructure incorporates robust excavation and earthmoving techniques. It features a specialized underground powerhouse and a high-capacity spillway to ensure reliable operation within complex mountainous terrain.

Structural Specifications

Maximum Dam Height
101 m
Dam Crest Length
1090 m

Construction Metrics

Total Earthmoving

18 million m3
Excavation and Earthmoving

Facility Details

Underground Powerhouse Dimensions
30 m x 12 m
Spillway Width
48 m

Material Composition

Dam Construction Type
Clay CoreRock Fill

Vous souhaitez sourcer ce produit ?

Soumettez une demande pour être mis en relation avec des fabricants vérifiés qui produisent ce produit.

Your information is protected. Privacy policy · Terms of service