1000 MW Power Plant Project
This power plant project involves the construction of two 1000MW generating units. It includes advanced boiler technology, turbine-generator systems, and emissions control.



Technical Specifications
Project Overview
High-Efficiency Power Generation
This 1000 MW-class power plant project features two ultra-supercritical thermal power generating units, each with a capacity of 1036 MW. The facility represents a milestone in engineering, being the world's first to integrate seawater flue-gas desulfurization (FGD) technology with ultra-supercritical generation. Designed for energy efficiency and environmental compliance, the plant was commissioned for full-scale operation in April 2010.
Technical Specifications
Total Installed Capacity
Technology Type
- Unit Configuration
- 2 x 1036 MW
Environmental & Compliance
Environmental Systems
- Seawater Flue-Gas Desulfurization (FGD)
- Simultaneous Desulfurization and Denitrification
- Energy-saving design
Project Timeline
Key Dates
| Milestone | Date |
|---|---|
| 168-Hour Test Run (Units 1 & 2) | June 2009 / Sept 2009 |
| Full Operational Status | April 2010 |