
Yichang Jinsen Light Electric Co., Ltd. develops and manufactures cold cathode fluorescent tubes (CCFL), backed by automated production capability and ISO 9001:2000 quality management.
Yichang Jinsen Light Electric Co., Ltd. specializes in the R&D and manufacture of cold cathode fluorescent tubes (CCFL). Established in December 1995, the company developed from the foundation of an earlier sole proprietorship and has grown into a high-tech enterprise focused on CCFL development and production.
The factory operates on a site covering 50,000 m² and has invested in automation and testing capability, including the installation of CCFL fully automatic equipment and the introduction of internationally leading CCFL testing and measurement equipment. Mass production began in January 2005, with additional CCFL production lines installed in subsequent years.
Quality management is integrated into operations, with formal adoption of the ISO 9001:2000 quality management system certification in early 2004 and production organized under the ISO 9001:2000 system. The company also reported obtaining utility model patents and maintains ongoing patent filings, supporting continuous improvement in process and product development.

The company focuses on the development and manufacture of cold cathode fluorescent tubes (CCFL), integrating R&D with scalable production to serve industrial customers.
Operations include CCFL fully automatic equipment and dedicated CCFL testing and measurement equipment, supporting stable mass production and consistent quality control.
The company obtained two utility model patents and maintains additional patent declarations to support continuous technical development.
The company built up multiple CCFL production lines, with a plan to reach 23 automatic production lines by the end of 2007.
Established and developed from the foundation of an earlier sole proprietorship.
Cooperation agreement signed with Japanese light-industry technical experts.
Automated CCFL equipment was installed to strengthen production capability.
Formally adopted ISO 9001:2000 quality management system certification.
Production organized under the ISO 9001:2000 quality management system.
Internationally leading CCFL testing and measurement equipment was brought into operation.
Mass production officially began.
Two utility model patents were obtained and RoHS certification was achieved; additional patents were filed.
Nine CCFL production lines were installed smoothly to expand capacity.
An additional CCFL production line was successfully installed and began operation.
Targeted scale-up to 23 automatic production lines.
Envoyez une demande pour en savoir plus sur leurs capacités et obtenir des devis personnalisés.